← All services

Fibre feasibility

Independent fibre feasibility, site by site.

Before you commit capital to a site, find out which fibre actually reaches it, how much capacity sits behind it, and whether the paths in are truly separate. We ask every carrier the same questions and give you the answers side by side.

Carrier-neutralThe same request goes to every carrier About 2 weeksTypical carrier turnaround Site by siteEach site scored and costed on its own

How it runs

Five steps from coordinates to a scorecard.

Every site goes through the same steps, so results compare across carriers and across sites.

  1. Site intake and engineering prep

    Site coordinates and boundaries confirmed. Internal engineering maps each site to its nearest exchanges, points of interconnect and points of presence, and prepares the carrier request pack.

  2. Desktop study

    Fibre proximity across the Tier 1 carriers, NBN and the Tier 2/3 providers, with the nearest network nodes identified for every site.

  3. Carrier feasibility About 2 weeks per carrier

    Requests issued to carriers in batches on a confidential basis. Each carrier returns a traffic-light result for each site.

    Green

    On-net or near-net. Service available.

    Yellow

    Near-net. Desktop build price provided.

    Red

    Full feasibility required. May carry a carrier fee; client decides case by case.

    Confirmed with each carrier

    • Capacity at the nearest POI / POP
    • Backhaul capacity beyond it
    • Capacity available to the site
    • Backhaul routes and diversity
    • Indicative build cost to site
    • Incumbent pricing zone and footprint
  4. Diversity and independent check

    Carrier routes overlaid to expose common paths and shared infrastructure. The target is two to three major carriers able to bring fibre, dark fibre where required, into the site on separate paths.

  5. Executive summary

    One summary per site: the carrier scorecard, indicative costs, diversity findings and key risks, ready for internal review.

Carrier scorecard

A readiness percentage and indicative costs for every carrier. You judge viability on the numbers.

See how it's scored →

Next step · separate engagement

Closed carrier RFP

An invite-only tender to the carriers who took part in the feasibility. Run inside a broader RFP, or independently by Gimbal on your behalf.

Behind the flow

What we ask, and how we test the answers.

Several carriers are not always several paths. Two carriers in the same trench fail together, so the route detail matters as much as the capacity.

Step 3

What each carrier is asked

RequestWhy it matters
Capacity at the nearest POI or POPThe local ceiling: what the carrier can hand over at its closest node.
Backhaul capacity beyond itA local node is only as good as the capacity behind it.
Capacity available to the siteFibre pairs or bandwidth the carrier can deliver at the site boundary.
Backhaul routesRoute detail is what lets us test whether two carriers share a path.
Fibre ownership by segmentA carrier leasing another carrier's fibre is not a second path.
Indicative build cost and lead timeDesktop figures for closing the gap between network and site.
Incumbent pricing zone and footprintSets recurring pricing, and shows whether the site sits inside the existing fibre footprint.

Step 4

How diversity is tested

Every carrier path is checked across five segments for anything shared with another carrier.

  1. 1Site entry
  2. 2Access to nearest node
  3. 3Regional backhaul
  4. 4Long-haul
  5. 5Termination

Checked on every segment

  • Shared trench, duct or pole route
  • Shared river, rail or road crossing
  • Shared exchange, POP or POI
  • One carrier riding another's fibre
  • Shared power to active equipment

Diversity levels

  • D0Single path
  • D1Different carriers, same path
  • D2Separate routes, shared node
  • D3Fully separate end to end
  • D3+D3 plus a third independent path

Step 5

A scorecard, not a verdict.

Each carrier gets a readiness percentage for the site, with the cost lines beside it. Whether the project stacks up is your call, and it usually comes down to the dollars.

Readiness is scored on five factors

FactorWeight
Network proximityThe Green / Yellow / Red result25%
Capacity at POI / POP and backhaulAvailable now, and the upgrade ceiling25%
Capacity to the siteDeliverable at the site boundary20%
Path independenceSeparation from every other carrier20%
Lead timeTime to service, including any build10%

Worked example: one site, four carriers Example only

CarrierResultReadinessBuildMonthlyCarrier feeLead time
Carrier AGreen90%$40k$6.5kNil3 months
Carrier BYellow73%$380k$7.0kNil7 months
Carrier CYellow56%$290k$5.5kNil6 months
Carrier DRed46%TBCTBC$8kTBC
2carriers at or above 70% readiness
$420kindicative one-off cost to connect the best two
$710kto connect three

In this example Carrier C shares its route with Carrier A, so adding it brings a further choice of provider but no extra path. Figures are illustrative and not drawn from any site or carrier. Build costs are carrier desktop estimates, indicative until a full feasibility is completed.

Terms used

The jargon, in plain English.

POI
Point of interconnect. Where a service provider's network connects to the NBN.
POP
Point of presence. A carrier's network node where services can be handed over.
Backhaul
The capacity carrying traffic from a local node back to the core network or a capital city.
On-net
The carrier's fibre already reaches the site or its boundary.
Near-net
The carrier's fibre is close enough that a short extension connects the site.
Dark fibre
Unlit fibre pairs leased to the customer, who runs their own equipment over them.
Desktop build price
A carrier's estimate from records and maps, without a field survey. Indicative only.
Full feasibility
A carrier's detailed design and survey. Slower, sometimes charged, and firmer on cost.
Path diversity
Two or more routes with no shared trench, crossing or node, so one fault cannot take out both.

Every finding carries an evidence label

  • ConfirmedStated by the carrier in writing
  • DesktopTaken from a public source
  • AssumedOur inference, with what would confirm it

Next step

Got a site you need a straight answer on?

Send us the coordinates or lot boundary and what you plan to build there. We'll tell you what the study would cover and how long the carriers are likely to take.